ADAPTIVE PASSIVE HEAVE COMPENSATION

IN GENERAL

Safelink’s newest PHC units have an unbeatable interactive control system. We have transferred our knowledge about how PHC should work at different stages of marine operations and given the unit the ability to adapt to various environments. The units are just as rugged and easy to implement as standard PHC. It offers excellent performance for both topside and subsea applications – targeting all dynamic challenges with one single unit.  

Safelink_Adaptive_Passive_Heave_Compensator_PHC_Singapore

ADAPTIVE PASSIVE HEAVE COMPENSATION

HIGHLIGHTS
Selected features:
   ● Excellent performance for both topside and subsea applications
   ● Ability to target multiple application areas during the same operation
   ● Movement and velocity data can be retrieved for evaluation of the operation
   ● User friendly setup with handheld tablet.

TOPSIDE AND SUBSEA MODE
Our advanced mechanical design and control system enables the unit to be preset with several combinations of gas spring and hydraulic damping. Settings can be changed automatically or manually by tablet (topside) or ROV (subsea).

SHOCK ABSORPTION
Safe deployment through the splash zone:
   ● Remove the risk of slack slings and/or snap loads.
   ● Reduce dynamic load variations.

OVERLOAD PROTECTION WITH OPTION FOR SUBSEA ADJUSTMENT
   ● Extend to compensate if forces exceeds estimated values.
   ● Overload protection in case the active heave compensation system fails.
   ● Read actual registered load during operation (ROV panel).
   ● Adjust settings subsea during the operation to compensate for inaccuracies.

SUBSEA RESONANCE AVOIDANCE
Resonance occur when the natural period of the lifting system is equal to the surrounding wave period. It is difficult to estimate exactly at what water depth these periods will converge.
   ● Our adaptive PHC solutions will change the natural period of the lifting system to completely avoid resonance,
       even in ultra deep water.

LANDING SPEED REDUCTION
 Operational requirements when installing various subsea structures normally include a maximum value for landing velocity. It is essential that these requirements are met. Safelink adaptive PHC solutions will increase the weather window and reduce down time of subsea installations.
   ● Excellent performance for landing speed reduction.
   ● Reduce landing speed for all wave periods – even for long wave periods.
   ● Reduce landing speed for all structures – even for structures with little drag and added mass properties.

SUBSEA RETRIEVAL WITH OPTION FOR SUBSEA ADJUSTMENT
Subsea retrieval (e.g suction pile retrieval)
   ● Extend and retract to compensate for the dynamic load variations caused by topside movement.
   ● Extend to compensate if pull out forces exceeds estimated values.
   ● Controlled retraction when the subsea structure is released from the seabed.

Pull-out forces can be difficult to estimate and we often see that these operations require overload protection to deal with deviations. Including our adaptive PHC solution will enable the option to:
   ● Read actual registered load during pull-out (ROV panel)
   ● Adjust settings subsea during the operation to compensate for inaccuracies.

RECORDED DATA FOR POST-PROCESSING
Onboard computer data can be retrieved after lift
   ● Verify that operation was conducted within end-clients requirements.
   ● Measurements of forces and payload motions.
   ● Can be used to verify installation analysis
   ● Computer log can be synchronized with vessel MRU.

CONTACT

Orange Delta Equipment is the official Safelink sales representative in Singapore. Please contact us if you have any questions or a specific requirement for any Passive or Active Inline Heave Compensators.  

Call us:
+65 9030 3518

Follow us on:

Email:
pgo@orangedelta.sg

WhatsApp:

Orange Delta Equipment Pte Ltd

36 Purvis Street #02-07
Singapore S188613
 

Office Opening hours:
Mon to Fri: 8AM to 6PM

Scroll to top